Been trying to post photos for a while so I am giving it another go.
Success!!!!!!!!!!!!!!!!
The first one is the arrival and then CK unloading it peice by peice then all the metalwork lying on the bed where it is to go.
Success!!!!!!!!!!!!!!!!
The first one is the arrival and then CK unloading it peice by peice then all the metalwork lying on the bed where it is to go.
pond liner and wait till it fills up trust me it doesnt take long attach rope to bucket and away you go. When you get fed up with rope and bucket you can go to phase 2 which is a real jaw dropper and works like a dream. 12 volt boat bilge pump 12 volt liesure battery and fifty quid solar panel battery charger.Battery has never run flat yet after 2 years use. Phase three is a tank stand 3Ft 6"high and long enough to take 5 water butts into which i pump the water from the pit in winter when its full. havent used tap water in the tunnel for about to years
Comment