Hi,
I have dug down bettween 1 1/2 and 2 foot and think I will stop there. It could be bedrock as you say as the land is at the top of a canal. There are trees growing well and brambles growing VERY well until last week! the soil seems good, plan to but top soil down next week and raised beds for the veg.
How deep will the soil need to be to plant potato etc?
Thanks again,
Mandy |